account_treeEnterprise Solutions

AI Platform for
Construction Costs

Quantity takeoff, cost management, and AI construction assistant throughout the project lifecycle.

AlphaQS Ecosystem

6 core modules integrated into a unified ecosystem.

architecture
AlphaQS
upload_file
Upload Drawings

Upload Drawings

Accept PDF/CAD/images, auto-classify documents

document_scanner
AI Read & Takeoff

AI Read & Takeoff

OCR, element recognition, quantity suggestion

request_quote
BOQ + Pricing

BOQ + Pricing

Separate materials, labor, machinery, supplies

account_balance_wallet
Actual Expenses

Actual Expenses

Track spent, remaining, budget overrun alerts

inventory_2
Material Retrieval

Material Retrieval

Query steel, concrete by stage, suppliers

menu_book
Construction Guide

Construction Guide

Construction methods, checklists, illustrations

AI Document Processing Pipeline

From raw drawing files to detailed BOQ, through 7 automated steps.

1

Receive File

PDF, CAD, Image

2

Render/OCR

Text, Tables, Symbols

3

Classify Drawings

Arch, Struct, MEP

4

Recognize Elements

Levels, Columns, Slabs

5

Extract Tables

Rebar, Door schedules

6

Draft BOQ

Quantities, formulas

7

QS Approval

Lock rows, export report

Pricing, Estimation & Overrun Control

Clear breakdown of materials, labor, machinery to build estimates and control overruns tightly.

functionsTotal Unit Price Formula

categoryMain Material
+
constructionSub Material
+
engineeringLabor
+
precision_manufacturingMachinery
+
local_shippingTransport
+
trending_downLoss
+
account_balance_walletMgt & Overrun
+
receipt_longVAT
=
Auto-calculatedBidding Unit Price
sync_alt

Flexible customization

Prices can be adjusted by project, province, company rates, or imported from Excel.

monitoring

Overrun Control

Track expected cost, bid price, actual cost, and cost overruns on each item.

table_chart

Instant Material Retrieval

Separate main materials (Concrete, steel) and accessories (Nails, tie rods) for precise procurement planning.

smart_toyAI Assistant

AI Material Retrieval

Ask AI: What to buy, how much, and where?

Automatically retrieve from BOQ, pricing, schedule, and suppliers to quickly answer owners or engineers.

smart_toy

AlphaQS AI

Online

What steel is needed for the slab?

autorenew
Retrieving

Ongoing slab BOQ, steel schedule, prices, purchase status.

check

Level 2 slab steel: 1.34 tons ($0.7/kg). Total: $938. Need weighbridge slip, receiving checklist. Status: Not ordered.

Type your question...
send